
An advanced children's hospital with 250 beds to be built at SN Medical College in Agra, featuring operation theatres for children's surgery and a two-wing design plan
Facilities for children's surgery will also be provided at the proposed advanced children's hospital at SN Medical College in Agra. To be built under the college's integrated plan, this hospital will have two wings, one of which will be a paediatric surgery wing. According to Principal Dr Prashant Gupta, the proposal has been sent to the government and the hospital […]

Facilities for children's surgery will also be provided at the proposed advanced children's hospital at SN Medical College in Agra. To be built under the college's integrated plan, this hospital will have two wings, one of which will be a paediatric surgery wing. According to Principal Dr Prashant Gupta, the proposal has been sent to the government and the total capacity of the hospital will be 250 beds.
What is going to be built
According to the plan, the multi-storey hospital will have a paediatric surgery wing, which will house modular operation theatres. Congenital disorders and other surgeries related to children can be performed here. A neonatal intensive care unit (NICU) facility will also be available. Children suffering from other illnesses will be admitted to the second wing, and the same building will house pathology testing facilities. According to the principal, this will save patients from running around to different departments for tests, treatment and operations.
Currently, the paediatrics department does not have surgical facilities. When surgery is required, children are referred to the surgery department. According to the principal, for the first time in the new hospital, children will get treatment along with surgical facilities under one roof.
The problem with the old building
The paediatrics department at SN Medical College is currently operating in a dilapidated building and has 120 beds. During the assessment of the college's old buildings, the paediatrics department building was found to be the most dilapidated. Once the new hospital is built, the department will be shifted out of that building, which is planned to be demolished.
Status of the project
The scope of the project has changed at different times. In May, an eight-storey hospital with 200 beds was proposed. Later, the DPR mentioned 250 beds, a nine-storey building and a 50-bed NICU, with an estimated expenditure of around Rs 70 crore. In September, it was stated that the children's hospital would be built first under the second phase of the integrated plan and the revised DPR was being sent to the government. It was stated that construction would take a year and a half. There is still no confirmed information regarding government approval and the date construction will begin. Changes to the final budget, bed capacity and design are possible.


